Wastewater treatment in Iceland is still in its infancy. Most municipalities operate only primary treatment or no treatment at all, at a time when requirements for treatment, monitoring and reporting are increasing.
HD assists municipalities, utilities and companies in finding and implementing the right solutions in wastewater and treatment in partnership with Veolia Water Technologies. The service covers everything from site assessment and solution selection to installation, monitoring and servicing throughout the equipment's entire life cycle.
For further information, please contact:
Palmar Sveinn Ólafsson, sewer salesman
palmars@hd.is Telephone: 560 3641
Significant development in sewage treatment is on the horizon in Iceland. The situation in larger urban areas clearly shows the need for targeted development and solutions that can be implemented in phases.
The figures clearly show how far there is to go.
Requirements for wastewater treatment plants regarding cleaning, monitoring and data reporting are increasing. Regulation No. 1450/2025 tightens the requirements for treatment, monitoring and data reporting, and the revised EU Sewage Directive (2024/3019) provides for even further treatment in the coming years.
Two-stage cleaning is the general principle., but the correct implementation depends on the size of the system, the load and the reception. In addition, requirements for the registration of overflows and information on flow, purification and sludge are increasing.
This does not only apply to larger sewerage systems. Smaller local authorities also need to assess what level of treatment is appropriate and how best to build it for the future.
The purification process consists of stages, with each step removing more impurities and producing cleaner water.
Thus, the system can be built up in stages as required, and investment can be made where the greatest benefit is achieved at any given time.
Veolia Water Technologies is a world leader in water and wastewater solutions. Through the partnership, the Icelandic market gains access to Veolia's international technology and expertise, supported by HD's local implementation and service.
Veolia proposes process design, international experience and proven solutions for biological and advanced treatment – including AnoxKaldnes™ MBBR/IFAS, MBR and nutrient removal.
HD proposes Knowledge of Icelandic conditions, project management, construction, installation, commissioning, condition monitoring, maintenance and spare parts – and contact with the customer throughout the entire lifecycle.
.
ECOSIM™ from Veolia is a compact treatment plant in a container unit, designed for efficient biological sewage treatment.
The solution is suitable for small and medium-sized sewage systems, reduces the need for extensive construction work and allows the treatment plant to be built in line with current and future demands.
![]()
![]()
ECOSIM™ From Veolia, combines effective biological treatment, simple installation and flexibility in a compact solution.
The system reduces the need for extensive construction and makes it easier to build up the treatment capacity in line with current and future demands.
HD helps local authorities and utilities find the right path to improved wastewater treatment. HD assesses conditions and needs, selects a suitable solution and handles equipment, installation and servicing.
With solutions from Veolia, including ECOSIM™, HD can offer a flexible way to build the treatment plant in phases and meet increasing demands without immediately undertaking extensive construction work.
Whether you're preparing a new treatment plant, upgrading an older system or simply want better oversight, a short chat with the HD experts is a good place to start – with no obligation.
A person unit is a measure of organic load equivalent to the load from one person per day. Load is assessed in person units, not solely based on population, as industrial activity and tourism can significantly increase the load.
Yes. Sewage from smaller settlements also requires appropriate treatment. The Health Authority assesses what constitutes appropriate treatment in light of the receiving environment and the load. A phased solution, for example a treatment plant in a container, can be well suited.
Operational sewerage systems using filtration equipment under the old regulations can, under certain circumstances, continue to use it until 31 December 2027. It is advisable to use this time to assess the situation, gather data and prepare for the next phase.
Yes, and that is often the most sensible approach. It starts with pre-treatment, followed by biological treatment and sludge treatment in stages. It is important to choose solutions that can be scaled up.
It depends on the scope and the available information. Please get in touch and we will review the matter with you and make a proposal for the scope.